Piling Solutions
Need a Piling Solution Tailored to Your Sites Specific Requirements? We’re Here to Help.
Should your project require specialist foundations; we can deliver a piling solution to suit your specific requirements. All of our solutions and designs are carried out by our experienced in-house Engineers with designs covered by our own Professional Indemnity Insurance.
Piling
Techniques
Which Technique Do I Need?
| SFA | Steel Cased Driven | Micropiles | Screw Piles | Jacked-Down Piles | Pre-cast Piles |
|
| Low vibration during installation? | ✓ | ✓ | ✓ | ✓ | ||
| Restricted access site? | ✓ | ✓ | ✓ | ✓ | ✓ | |
| Small, lightweight plant required? | ✓ | ✓ | ✓ | ✓ | ✓ | |
| Appropriate for use in very soft, weak soils? | ✓ | ✓ | ✓ | ✓ | ✓ | |
| Appropriate for use around existing tree roots? | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Appropriate for use around sensitive site services? | ✓ | ✓ | ✓ | ✓ | ||
| Spoil created during installation? | ✓ |
Design Services
With options like sectional flight auger piles, bottom-driven steel piles, and small-diameter pin piles, our in-house engineers create piling designs that improve structural support and prevent costly redesigns. Covered by Professional Indemnity Insurance, our piling design services deliver reliable strength and support to even the most challenging soil conditions.
Frequently
Asked Questions
What is piling, and why is it necessary for my project?
Piling is a deep foundation technique that transfers building loads to stable soil layers deep underground, essential for projects on weak surface soils or with heavy structural loads.
How do you determine which piling method is suitable for my project?
The suitable method depends on factors like soil type, load requirements, project space constraints, and environmental impact. A site assessment or geotechnical survey helps guide this choice.
What factors impact the cost of piling?
Cost factors include soil conditions, pile type and material, pile depth, equipment and labour requirements, and any access or site restrictions.
How long does a piling project typically take?
Timelines vary, with small projects taking a few days to a week, while larger ones may take several weeks, depending on site conditions and project complexity.
Can your piling solutions be used on projects with restricted access or limited space?
Yes, we offer piling solutions, such as mini-piling, that are suited for confined or restricted-access spaces.
What information do you need from me to get started on a piling design?
We’ll need a geotechnical survey, load requirements, site plans, access information, and any budget or timeline constraints to create an effective piling design.
How do your piling solutions improve structural support?
Our piling solutions transfer loads to deeper, stable soil layers, preventing settlement and providing a solid foundation, essential for the long-term stability of structures.